What was amazing was that the building was still occupied, with builders working through floor by floor, minimising disruption while maintaining maximum utilisation. It was immediately apparent that this was a real partnership between residents, builders and staff, with all working closely together to ensure the success of the project. Despite the inevitable disruption to day to day life, all parties were accommodating one anothers needs with understanding and respect. Each group spoke highly of the professionalism and commitment that was apparent at every level.
The rebuild itself is hugely inspirational, with no effort being spared to ensure that the project will be finished on time and in budget. The latest technologies are being introduced to ensure longevity and to reduce future maintenance costs, while ensuring that in every respect the new build will be fit for purpose and an exemplar of what can be achieved.
The professionalism and pride in the project of ‘Junior’ and his team of builders shone through. The commitment of hostel manager Pat and her staff, working together with the builders to reduce the intrusion into the lives of residents, was equally impressive. The residents to whom I spoke, felt involved, respected and excited by the project that is transforming New Belvedere House.
The highest standards of planning and project management were clearly apparent. This was reflected in the amazing level of detail being applied to ensure that the new building would enhance the lives of residents and staff. The room configurations have been well thought out and designed to meet the needs of future residents; they feature multiple plug sockets, USB charging points, easy clean, hard wearing surfaces, robust windows and high levels of ventilation and insulation.
The new training kitchen is an outstanding facility which I have no doubt will prove to be of inestimable value to those passing through New Belvedere House.
I also had a chance to visit The Old Rectory and see how well it was being maintained and looked after; everything looked well-loved and as new, albeit a year after completion. The lasting impression of my visit was of highly motivated professionals working extraordinarily well together, using the latest technology and materials that will endure, to provide a fitting home for residents and working environment for staff.
